No Project Name Project Location Installed Capacity
(MW)
Interest
(%)
Attributable Installed Capacity
(MW)
Projects in Operation
1 Phase I of Gansu Jiuquan Project Gansu Province 100.5 100 100.5
2 Phase II of Gansu Jiuquan Project Gansu Province 49.5 100 49.5
3 Phase III of Gansu Jiuquan Project Gansu Province 201 100 201
4 Phase IV of Gansu Jiuquan Project Gansu Province 100.5 100 100.5
5 Phase V of Gansu Jiuquan Project Gansu Province 20 100 20
6 Gansu Anbei Project Gansu Province 601 100 601
7 Heilongjiang Hongqi Project Heilongjiang Province 49.5 100 49.5
8 Heilongjiang Hailang Project Heilongjiang Province 49.75 100 49.75
9 Jiangsu Dafeng Project Jiangsu Province 200.25 100 200.25
10 Inner Mongolia Chayou Zhongqi Project Inner Mongolia 49.5 100 49.5
11 Hubei Macheng Chunyangshan Project Hubei Province 80 100 80
12 German Bönen Project German 8 100 8
Projects under Construction
13 Phase II of Jiangsu Dafeng Project Jiangsu Province 100 100 100

As of 31 December 2018, the Group’s controlled installed capacity of wind power in operation was 1,509.50MW, with annual power generation of 2,822,421.12MWh, representing an increase of 27.19% compared with last year. Hubei Macheng Chunyangshan Wind Power Project with an installed capacity of 80.0MW commenced operation at full capacity. During the period, the wind power curtailment rate of the Group’s wind power projects was 20.40%,representing a significant decrease when compared with 37.20% for last year. The power generation of this segment accounted for 27.85% of the Group’s total power generation. The current capacity under construction of the segment was 100.0MW (The aggregate amount of wind power projects did not include Shanghai Sea Wind Power Projects and Shanghai Chongming Beiyan Project)