No Project Name Project Location Installed Capacity
(MW)
Interest
(%)
Attributable Installed Capacity
(MW)
Projects in Operation
1 Yunnan Kunming Project Yunnan Province 30 100 30
2 Phase I of Hainan Haikou Project Hainan Province 24 100 24
3 Guizhou Guiyang Project 1 Guizhou Province 24 100 24
4 Anhui Wuhu Project Anhui Province 24 89.67 21.52
5 Phase II of Hainan Haikou Project Hainan Province 24 100 24
Projects under Construction
6 Hebei Bazhou Project Hebei Province 24 100 24
7 Sichuan Deyang Project Sichuan Province 24 70 16.8
8 Guizhou Renhuai Project Guizhou Province 24 100 24
9 Henan Project Henan Province 24 70 16.8
10 Liaoning Tieling Project Liaoning Province 24 51 12.24
11 Henan Shangqiu Project Henan Province 24 85 20.4
12 Phase III of Hainan Haikou Project Hainan Province 40 100 40
13 Hainan Qionghai Project Hainan Province 25 100 25
14 Liaoning Beizhen Project Liaoning Province 18 100 18

As of 31 December 2018, the Group’s controlled installed capacity of waste-to-energy power in operation was 126.0MW, with annual power generation of 790,185.50MWh, representing an increase of 50.74% compared with last year. Waste processed amounted to 2,047,000.0 tons. The growth in the segment was primarily due to the commencement of operation of additional capacity of Guizhou Guiyang Project (24.0MW). The power generation of this segment accounted for approximately 7.80% of the Group’s total power generation. The current capacity of the segment under construction is 227.0MW, 96.0MW of which is expected to complete construction and commence operation in 2019.