No Project Name Project Location Installed Capacity
(MW)
Interest
(%)
Attributable Installed Capacity
(MW)
Projects in Operation
1 Phase I of Gansu Wuwei Project Gansu Province 20 100 20
2 Phase II of Gansu Wuwei Project Gansu Province 30 100 30
3 Phase I of Gansu Baiyin Project Gansu Province 20 100 20
4 Phase II of Gansu Baiyin Project Gansu Province 30 100 30
5 Phase III of Gansu Baiyin Power Project Gansu Province 15 100 15
6 Gansu Guazhou Project Gansu Province 8 100 8
7 Hainan Changjiang Project Hainan Province 20 100 20
8 Yunnan Yuanjiang Project Yunnan Province 20 100 20
9 Fujian Zhangpu Project Fujian Province 80 100 80
10 Sichuan Panzhihua Project Sichuan Province 34.32 100 34.32
11 Jiangxi Ji’an Project Jiangxi Province 14.07 70 9.85
12 Guangdong Dongguan Huimei Project Guangdong Province 0.8 70 0.56
13 Zhejiang Yunhe Project Zhejiang Province 13 60 7.8
14 Jiangxi Ji’an Aoli Project Jiangxi Province 2.5 100 2.5
15 Phase I of Fujian Zhao’an Project Fujian Province 20 100 20

As of 31 December 2018, the Group’s controlled installed capacity of photovoltaic power in operation was 327.69MW, with annual power generation o f 467,049.0MWh, representing an increase of 15.09% when compared with last year. The growth in the segment was primarily due to the commencement of operation of additional capacity of Zhejiang Yunhe Project (7.76MW); and larger increase in light radiation of Phase II of Gansu Wuwei Project and Fujian Zhangpu Project. The photovoltaic power curtailment rate was 1.10% for the Group’s photovoltaic power projects, representing an improvement as compared with 4.20% for the same period last year. During the period, the power generation of this segment accounted for 4.61% of the Group’s total power generation.