No Project Name Project Location Installed Capacity
(MW)
Interest
(%)
Attributable Installed Capacity
(MW)
Projects in Operation
1 Fujian Shaxikou Project Fujian Province 300 100 300
2 Fujian Niutoushan Project Fujian Province 115 52 59.8
3 Fujian Zhangping Huakou Project Fujian Province 36.6 100 36.6
4 Chongqing Meixihe Project Chongqing 129 100 129
5 Yunnan Yingjiang Hongfu Industrial Project Yunnan Province 64 100 64
6 Yunnan Yingjiang Huimin Project Yunnan Province 6.4 100 6.4

As of 31 December 2018, the Group’s controlled installed capacity of hydropower in operation was 651.0MW, with annual power generation of 1,553,657.30MWh, representing a year-on-year decrease of 27.92%. The decrease in power generation of the segment was primarily because the year-on-year decrease in water flow volume in Fujian district affected the power generation of hydropower projects. During the year, the power generation of this segment accounted for 15.33% of the Group’s total power generation.